In shops UPG-1 and UPG-2 of Nyagangazpererabotka, a branch of JSC АО SiburTyumenGaz, 5 compressors are operated. Prior to the upgrading 4 compressors were in continuous operation, at high peak times the 5th one was switched up.
On the basis of an updated receipt schedule (increased volume of incoming gas) an objective was set to upgrade a group of compressors in order to ensure the necessary total output and the minimum power consumption in the respective housings. One compressor unit was set aside for the first stage of upgrading to confirm the specified parameters.